Place:
|
|
TOTORAL – CHILE, SOUTH AMERICA
|
|
Main Contractor:
|
|
VESTAS ARGENTINA S.A. – BUENOS AIRES, ARGENTINA
|
|
Work:
|
|
MECHANICAL AND ELECTRICAL ASSEMBLY OF ALL THE ELEMENTS OF THE WIND TURBINES
|
|
Type:
|
|
VESTAS V90 – 2MW
|
|
Quantity:
|
|
23
|
|
Starting date:
|
|
15th May 2009
|
|
Duration:
|
|
6 MONTHS
|
|
|
||
|
PICTURES
|
||
|
|
||
|
|
||
|
|
||
|
Together with Vestas we checked, planned and prepared
every part of the installation process before the erection.
|
||
|
|
||
![]() |
||
|
|
||
|
Installing the nacelle on a Vestas V90.
|
||
|
|
||
![]() |
||
|
|
||
|
Each blade is nearly 45 meters long.
|
||
|
|
||
![]() |
||
|
|
||
|
23 new wind turbines have been erected to produce clean and renewable energy.
|
||