|
Place:
|
|
HAVSNÄS – SWEDEN
|
|
Main Contractor:
|
|
VESTAS NORTHERN EUROPE – MALMÖ, SWEDEN
|
|
Work:
|
|
MECHANICAL AND ELECTRICAL ASSEMBLY OF ALL THE ELEMENTS OF THE WIND TURBINES
|
|
Type:
|
|
VESTAS V80 – 2MW
|
|
Quantity:
|
|
48
|
|
Starting date:
|
|
09th June 2009
|
|
Duration:
|
|
6 MONTHS
|
|
|
||
|
PICTURES
|
||
|
|
||
|
|
||
|
|
||
|
The northern part of Sweden is a very specific region of the World.
Temperatures below zero and high wind speeds make this amazing place
very inaccessible with tough working conditions.
|
||
|
|
||
|
|
||
|
|
||
|
Installing the top section of a Vestas V80 tower.
|
||
|
|
||
|
|
||
|
|
||
|
|
||
